Graffiti Shield Inc. Applies Custom Shield to TOBY Nominee Elevators

When the US Bank Building in Los Angeles Ca. was being inspected from head to tail for The Outstanding Building of the Year (TOBY) award, they called upon Graffiti Shield to produce a Gloss Black version of Custom Shield films to revitalize the wear and tear on their elevators.  Utilizing our pre-cut pattern system, installation took only about 20 min per elevator; leaving them looking brand new with a removable and replaceable film system.

  • Posted by graffiti-shield

0 Comments